Planning

Volume VIII. Planning Drawings 

Site Layout – Master Sheet

Site Layout – Sheet 1

Site Layout – Sheet 2

Site Layout – Sheet 3

Site Layout – Sheet 4

Site Layout – Sheet 5

Site Layout – Sheet 6

Site Layout – Sheet 7

Site Layout – Sheet 8

Site Layout – Sheet 9

Site Layout – Sheet 10

Site Layout – Sheet 11

Site Layout – Sheet 12

Site Layout – Sheet 13

Site Layout – Sheet 14

Site Layout – Sheet 15

Site Layout – Sheet 16

Site Layout – Sheet 17

Drainage Layout – Master Sheet

Drainage Layout – Sheet 1

Drainage Layout – Sheet 2

Drainage Layout – Sheet 3

Drainage Layout – Sheet 4

Drainage Layout – Sheet 5

Drainage Layout – Sheet 6

Drainage Layout – Sheet 7

Drainage Layout – Sheet 8

Site Location

Sight Lines – Sheet 1

Sight Lines – Sheet 2

Bridge Details

Wheel Wash Locations

Master v3.5

EirGrid Substation Building

IPP Substation Building

Compound Entrance Gate Details

Palisade Fence Details

Property Fence Details

Foul & Rainwater Tanks Details

110kV Cable Trench Details

110kV Joint Bay Details

110kV HDD Watercourse

Substation Layout

Substation Elevations

Substation Sections

Substation Compound Drainage

Drainage Details

Cable Details

Crossing – Watercourse

Crossing – Public Road

Temp Compound No.1

Temp Compound No.2

Site Entrance Gate Details

Post and Rail Fence

Borrow Pit

Watercourse Crossing Details

TDR Work Area No. 2

Turbine Elevation Details – Model Options-5401

Turbine Elevation Details – Composite

Turbine Foundation Details

Turbine Hardstand Details

Wind Lidar Details

TDR

TDR Work Area No. 1

Landholding Boundary

Planning Boundary

Existing Contours

Scroll to Top